+39.030.9952733 service@ptmsrl.com
FOR SUPPORT: Download the online assistance software

PTM MANAGEMENT

Programming

From this page you are accessing the actual programming of the controller.

Before you start

To proceed with the programming of the controller it is necessary first to establish the components of recipes, recipes, and groups.

The first proposal from the screen contains the name of the software, the number of cards, and allows you to edit the change bandwagon. The “wagon Variation” is a percentage value which will apply to all the recipes that you will plan on the next screen.

In this screen the software makes it possible to arrange a new schedule, or recall and rework one of the last 3 previously recorded.

By selecting one of the available entries, proceed by clicking “Next”.

Programming

This page is structured into three sections. The main section is a summary of the data carrier, the number of heads, and other data relevant to the monitoring of programming tasks.

In the lower section displays two tables side by side: the left side there is a drop down menu that lets you select the recipe you wish to program. By clicking “Add”, the table is populated.

Select a recipe from the table, this turns green: to associate the selected recipe to a group, you need to go to the next section, select a group from the pull-down menu, and click “add”.

This action allows you to associate specific recipes to specific groups.

We have the data ready to program the controller. The system also provides a set of useful tool to simplifications of the “physical” operations on the controller.

Configuration Tool

In the right section, there are several tools that serve to facilitate the use of the ECU.

-Configure-Configure Groups

Need to sort the data before it is written on the control unit: in this way you can reduce direct work on the keys on the control unit.

-Import data of the controller updates all components and Groups the recipes with new data. Attention! This operation is not reversible. The “Update programming” button is very important: any variation is made on personal data, groups, components, recipes, to send it to the control unit, before this operation must be performed.

-Importing data backups of archived automatically by the control unit programming of loads and discharges, aligning all data of the controller with the software. For all that and unload arichi are no longer associated a record (for example, relating to obsolete schedules), the software creates planning objects by default. (Part 1, Part 2, Part 3)

Can not find what you are looking for?